CASE STUDY: MANUFACTURING

MINIMIZING DOWNTIME

Frequent challenges include:

  • Lost production time
  • Lead time for permanent solutions
  • Vendor response time
  • Identifying proper interim equipment solution

THE CHALLENGE

Finding a rental equipment vendor with a prompt response time to keep production moving along. 

THE SOLUTION

One of the greatest challenges companies face when in need of an interim equipment solution is in finding a rental vendor that can accommodate the need in a timely manner. This is particularly important in manufacturing, where a downed piece of equipment can lead to costly lost production time, which is exactly what one Texas-based manufacturing company was facing when they reached out to HOLT Industrial Rentals for a compressed air solution.

Prior to reaching out to HOLT Industrial Rentals, the manufacturing company had placed an equipment order with a well-known rental company; however, the delivery window was too long, and the equipment wouldn’t arrive in time to meet their urgent need. Upon receiving the call from the customer, the HOLT Industrial Rentals team asked some key questions to assess the customer situation and quickly determined that the other rental company was sending them the wrong equipment for the job. HOLT Industrial Rentals promptly sent an expert technician to visit the manufacturing plant and determined that they needed a1550 oil-free air compressor.

Thanks to their rapid response time and thorough assessment process the HOLT Industrial Rentals team was able to provide the customer with the proper air compressor, quickly and efficiently, reducing lost production time.

“Our technicians are quick to respond to urgent needs, always starting with a thorough assessment to ensure both efficiency and accuracy.”
– MATT HOLLYWOOD, REGIONAL SALES REPRESENTATIVE, HOLT INDUSTRIAL RENTALS

DID YOU
KNOW?

The cost of downtime in manufacturing is among the highest of any industry. In fact, a 2023 study by Aberdeen’s research found that, on average, downtime can cost a manufacturing company $260,000 per hour. Take into account long lead times for an interim rental solution and a company’s financial health can be deeply affected. Whether downtime is planned or unplanned, having a reliable rental partner is a must for companies in this industry.

EQUIPMENT UTILIZED

1550 CFM/125 PSIG 

  • Oil free
  • Diesel compressor

 



INDUSTRIAL POWER, CLIMATE CONTROL, AND COMPRESSED AIR

MORE THAN EQUIPMENT. SOLUTIONS.

HOLTINDUSTRIALRENTALS.COM  |  844.660.Rent (7368)